About this project
The Plukon chicken slaughterhouse approached Odour Balance with a new issue concerning one of its departments, the Broei-Pluk.
Significant amounts of chlorine vapors are released during the cleaning of the production lines. The existing air-handling system—two biofilters on the roof of the hall—was designed to treat normal production air. Because the chlorine vapors linger in the room during cleaning, this causes discomfort for the staff. Since chlorine breaks down the microorganisms in biofilters, passing the vapors through these filters was not an option.
Due to an increase in odors in an adjacent room, it became necessary to also treat the exhaust air from that room. As a result, the Panklaar-department also had to be filtered from then on. The customer therefore asked Odour Balance if it could develop a solution that would cover both the Fermentation and Harvesting Department and the Ready-to-Cook Department in a single project.
Collaboration Partners
Expansion and New Installations
In addition to the expansion of the existing anaerobic digestion plant, the project included new manure anaerobic digestion plants, a biogas engine with heat recovery, a facility for upgrading biogas to green gas, and a facility that processes the digestate from the manure anaerobic digestion into bio-phosphate pellets. Utilities, buildings, and connecting systems were also part of the Vicoma contract.
Phase 1: Pre-Engineering
Using the available information, supplemented by assumptions and some technical data provided by the client, our engineer prepared an initial set of proposals and a flowchart for clarification. These designs formed the basis for the pre-engineering assignment that the client subsequently awarded to us.
The flow rate of the Panklaar was already known, but for the Pluk-Broei, we conducted our own site surveys and calculations. This information was essential for the next step.
The pre-engineering phase yielded a clear concept: During normal production, the Broei-Pluk can remain connected to the existing biofilters, as they have sufficient capacity for the regular process air. This is a sustainable treatment method that offers cost advantages because fewer activated carbon material changes will be required. So, during cleaning, the airflow from this section is diverted to a new activated carbon filter to be installed. Electrically operated control valves linked to the customer’s control system ensure that air is directed to this filter only during cleaning, so that the biofilters are not exposed to chlorine. The “Ready-to-Serve” section is permanently connected to the same activated carbon filter.
Because the air from both departments contains a high level of moisture and contaminants during production, it was necessary to equip the activated carbon filter with a pretreatment system. For this reason, a moisture separator was selected.
Phase 2: Detailed Engineering
During the detailed engineering phase, the preliminary concept was further developed into a fully implementable design. During this phase, all materials, pipe diameters, and exact dimensions were finalized. Based on this, we created a complete 3D drawing to give the client a clear picture of the future installation and the available space. Material selections were made based on the air flow rate and the gases contained therein.
During the detailed engineering phase, the planned pipe routing around the activated carbon filter and across the roof was adjusted once again. Space was limited, and we had to run pipes through existing walls. The routing was optimized to facilitate both maintenance and installation.
Due to its weight, the activated carbon filter had to be installed on the ground floor, but space there is limited and the ceiling is low. In the original setup, there would have been only one meter of headroom left for changing the material, which would have made it simply impossible. As a result, modifications also had to be made to the activated carbon filter itself.
The inlet pipe to the activated carbon filter has a diameter of 1,000 mm to accommodate the total flow rate and consists entirely of custom prefabricated sections to allow for installation in the confined space. The piping was largely prefabricated in our own workshop.