About this project
A major waste processing company, Omrin, decided to have a fourth digester built, which meant a new facility would have to be constructed on the site of their existing biofilter. Odour Balance was asked whether we could relocate the biofilter. To answer that question, our team had to assess the situation and evaluate the air to be treated through baseline measurements and calculations. It quickly became clear that the existing biofilter was too small for the measured airflow and the planned expansion.
Based on our findings and information provided by the client, we developed an initial design, which they approved.
Expansion and New Installations
In addition to the expansion of the existing anaerobic digestion plant, the project included new manure anaerobic digestion plants, a biogas engine with heat recovery, a facility for upgrading biogas to green gas, and a facility that processes the digestate from the manure anaerobic digestion into bio-phosphate pellets. Utilities, buildings, and connecting systems were also part of the Vicoma contract.
Phase 1: Pre-Engineering
During the subsequent “pre-engineering” phase, the existing installation and plant were roughly measured and mapped out. Based on these initial findings, our engineer determined, in broad terms, the future piping layout and the positions of the main components of the new plant. Omrin already had an existing pipe bridge that they wanted to reuse, and we had to take this into account in the design.
Phase 2: Detailed Engineering
During the “detailed engineering” phase, carried out after the contract was officially awarded, a 3D scan was performed, and our engineer documented the exact material selections and dimensions of all new components. In addition to the explicit request to build as circularly and sustainably as possible, we also had to take into account the high concentrations of NH3 and chemical stress. Based on these factors, we opted for stainless steel and aluminum for the piping and a concrete biofilter with a base made of recycled plastic. The 3D scan we provided offered our client a realistic visualization of the materials used.
Phase 3: Implementation
With the unanimous approval of the final design, we were able to move forward with the project’s implementation. By performing the 3D scan, we were able to have the piping custom-made and delivered to the customer.
During the construction phase, the client decided to dismantle the existing biofilter, so we quickly implemented a temporary solution. This allowed production to continue uninterrupted while we continued our work.
Once the ground had been prepared for installation, our team was able to complete the nearly 400m2 concrete biofilter and fit it with a liner and a plastic floor, after which it was filled with 800 m3 of biofilter material.
The filter was covered with a tarpaulin canopy stretched over a stainless steel frame and equipped with a tall chimney. Due to the large size of the components, our team used our 25-meter truck-mounted crane.
Because of the high NH₃ concentration, a chemical scrubber with an associated dosing and storage system was necessary. This system, including all associated air ducts and fans for supplying and exhausting the contaminated air, was installed and connected by Odour Balance.
We like to conclude our projects by commissioning the system and, if requested, training the client’s employees.
All work on the air-handling system that was not performed by Odour Balance itself was, however, carried out under our supervision.
Phase 4: Maintenance
Although the system can be monitored remotely thanks to the installed sensors, periodic inspections remain necessary. Our Measurement & Consulting department provides valuable support in this regard. They perform measurements that fall outside the range of the sensors, assess the moisture content of the biofilter material, check equipment, and conduct visual inspections of the entire system.
All findings are reported to the customer and supported by recommendations. This allows for the early identification of any repairs or necessary biomass replacements, ensuring that the system continues to operate optimally at all times.